Cut 1 4 inch above the flashing or window.
Flashing against existing panel siding.
Install the kickout flashing underneath the first shingle photo 1.
Hold a panel at the correct height and against a window or other obstruction to mark for the horizontal part s of a cutout.
If the shingle already has flashing on it the kickout flashing has to slip beneath it and you ll have to loosen or remove siding to do this.
Flush the end of the flashing length with the wall corner and secure the flashing to the framing with an 8d nail at each wall stud.
In certain instances flashing may need to be installed on the exterior of siding.
Using a metal j flashing between these types of transitions provides a barrier between siding and transitions that protects against water intrusion.
Install the flashing before you finish the top of the brick wall as the flashing must go behind the siding as well as behind and under the top row of bricks that angle outward to cover the top.
Again allow for a 1 4 inch gap.
A key part of my approach is using a special piece of flashing at this vulnerable intersection called kickout flashing or kickout diverter.
Flashing is a strip of metal usually aluminum about 8 inches long and bent at 90 degrees with each side at least 5 inches wide.
However in most instances step flashing should be installed behind siding.
Begin at either end of the wall and set the level middle section of the z flashing onto the top edge of the siding panel with the wider flange upward and against the wall framing.
But the j cap also creates a consistent line.
It is always recommended to install step flashing behind stucco dryvit wood panel lap siding vinyl siding cedar shingle siding etc.
Measure over from the other panel to mark the top and bottom of the vertical cut and snap a line between the marks.