Maintain the broken bond pattern throughout the roof and ensure a 5mm gap is left between each cedar shingle.
Fitting cedar shingle roof tiles.
Ensure the shingles are positioned square to the line of the eaves and verge.
Wood shingles are more susceptible to leaks than composite or asphalt shingles because they don t lock as tightly or lay as flat as traditional shingles.
Use pre formed shingle ridge tiles and nailing twice fix these into place with a minimum overlap that is the same as the shingle gauge on the roof covering.
Position and unroll the detail strip square to the line of the eaves.
Or nailing to fascia at 5cm centres.
It is the 1 composite synthetic roofing material alternative for homeowners and residential roofing contractors looking for alternatives to cedar shake shingles slate spanish clay tile barrel tile concrete tile asphalt shingles and metal roofing.
Cedar shingles are a traditional building material used for both roofing and siding.
Secure it to the roof by driving in two nails near the top edge of the shingle about 1 inch below its top edge.
Space the shingles 1 8 inch apart to allow for expansion.
Form the drip edge either dressing into gutter.
As with the roofing shingles make sure to leave a gap of 1 8 to 1 4 between each shingle to allow for expansion.
When installing cedar shingles it is important that the shingles are spaced appropriately and that each course of shingles overlaps the course beneath by the proper distance.
When installing ridge and hip shingles work inwards from the edges.
Minimum pitch for cedar roofs if you desire a cedar roof for your home the ideal pitch for your roof ranges from a five pitch to a 12 pitch.
Cut each shingle to fit at the end of each row.
Step by step guide on how to apply bituminous roofing shingles to your shed roof.
Includes useful advice on the best materials to use together with informat.
Jb shinglefix significantly reduces the time taken to install cedar shingles.
Step 3 put the next shingle about one eighth to one quarter of an inch away from the edge of the first shingle.
Fix by nailing top edge of detail strip using 10mm galvanised clout nails.
Request free samples to see why cedur roofing shakes are better.
Position the first shingle so its end overhangs the edge of the roof by 1 1 4 to 1 1 2 inches.